top of page
Permit Plans

Harbor Mesa_Page_01

Harbor Mesa_Page_02

Harbor Mesa_Page_12

Harbor Mesa_Page_01
1/12
Harbor Mesa Sign Program
This is a sign program with primarily pylon signs in Costa Mesa. Pylon signs are custom designed and built. This sign program was about 15 hours of deisng time including 8 revisions. Building signs were part of a different program.

Bloomfield Plaza 1

Bloomfield Plaza 2

Bloomfield Plaza 6

Bloomfield Plaza 1
1/6
Bloomfield Plaza Monument
This was a small project with only one custom built monument sign and about 6 hours of design time.

El Camino College_Page_01

El Camino College_Page_02

El Camino College_Page_25

El Camino College_Page_01
1/25
El Camino College
This is an ADA sign program with over 100 signs and all sign were taken from the architectural plans and layed out for fabrication. Due to the large amount of signs and sign types and having to indivudually lay out every sign for braille this sign program was over 30 hours of design time.
bottom of page